A customer has not answered the approved solar quote. Restate its scope before the estimator checks the follow-up.
What you need before you start
- The current approved solar quote
- Contact history for this quote
- Approved follow-up rules
Write these rules down first
- The approved quote controls scope, exclusions, and stated dates.
- Customer requests do not change the quote.
- The estimator settles conflicting quote versions before drafting continues.
What to tell the assistant
Read the current approved solar quote. Read contact history for this quote. Read approved follow-up rules. Draft the quoted scope, exclusions, and open questions. Keep the customer choice marked as waiting. Do not change equipment, add work, offer discounts, or claim savings. Stop on conflicting quote versions for the estimator. Use only these files. Mark missing facts. Do not guess. Prepare a draft for review. Do not send or change source files.
Check before it goes out
- Is the quote version current?
- Does every date come from the approved quote?
- Are equipment, price, and scope unchanged?
- Does the draft avoid discounts and savings claims?
What it never does
Write these limits into this job's instructions. Do not change equipment or promise savings. Changed quotes, scope, or dates need another review. Require staff approval before each message goes out.
Keep follow-up rules in your own system.
The lead follow-up system connects an assigned owner to the next approved reply. Keep the current source record with each draft. Staff retain approval over messages and any professional decision.
Next step for solar installers
Next step: read the industry page for solar installation. Check your own site: Is my trade business ready for AI? Free check.
