How to Draft an Estimate Follow-Up From the Price Sheet and Past Quote at a Plumbing or Electrical Contractor.

On this page (7)
  1. What you need before you start
  2. Write these rules down first
  3. What to tell the assistant
  4. Check before it goes out
  5. What it never does
  6. Keep follow-up rules in your own system.
  7. Next step for plumbing and electrical contractors

Keep approval of old plumbing or electrical estimate follow-up with your office lead. An owned system can draft the reply from the approved trade quote. Ask a provider to show how staff review each message before sending.

What you need before you start

Write these rules down first

What to tell the assistant

Read the current price sheet. Read the existing approved quote. Read contact history for this quote. Draft stated options, allowances, exclusions, total, validity, and written permit assumptions. Keep the customer choice marked as open. Do not add work, change prices, or promise parts or code approval. Do not approve permits or choose a start date. Use only these files. Mark missing facts. Do not guess. Prepare a draft for review. Do not send or change source files.

Check before it goes out

What it never does

Write these limits into this job's instructions. Do not change scope, order parts, or promise completion. Have the estimator approve proposal language before staff send it. Require staff approval before each message goes out.

Keep follow-up rules in your own system.

The lead follow-up system connects an assigned owner to the next approved reply. Keep the current source record with each draft. Staff retain approval over messages and any professional decision.

Next step for plumbing and electrical contractors