How to Prepare a Site Inquiry Summary From Call Notes: Paving, Concrete, and Flooring Contractors.

A caller asks about work at a site. Record the stated details and list the access and scope questions for the estimator.

On this page (6)
  1. What you need before you start the paving and concrete site inquiry summary
  2. Rules to write down before the paving and concrete site inquiry summary
  3. What to tell the assistant about the paving and concrete site inquiry summary
  4. Check the paving and concrete site inquiry summary before it goes out
  5. What the assistant never does in the paving and concrete site inquiry summary
  6. Next step after the paving and concrete site inquiry summary

What you need before you start the paving and concrete site inquiry summary

Rules to write down before the paving and concrete site inquiry summary

What to tell the assistant about the paving and concrete site inquiry summary

Read the call notes. Read the current service list. Read the written intake checklist. List location, requested work, callback details, access notes, and supplied files. Keep work types under the company's written service rules. Do not choose materials, assess site conditions, calculate a price, or book a crew. Leave missing access or scope for the estimator. Use only these files for this job. Mark missing information. Do not guess. Leave the draft for staff to check. Do not send, publish, or change the source files.

Check the paving and concrete site inquiry summary before it goes out

What the assistant never does in the paving and concrete site inquiry summary

Write these limits into this job's instructions. Do not choose materials, approve site conditions, or book a crew. Have the estimator check the summary before the office replies.

Next step after the paving and concrete site inquiry summary

Read the industry page for paving. Check your own site: AI visibility check for trades.