How to Prepare an RFQ Summary From the Intake Record: Machine Shops and Precision Manufacturers.
RFQ means a request for a quote. Use the current inquiry files to prepare missing questions for the estimator.
On this page (6)
- What you need before you start the machine shop RFQ summary
- Rules to write down before the machine shop RFQ summary
- What to tell the assistant about the machine shop RFQ summary
- Check the machine shop RFQ summary before it goes out
- What the assistant never does in the machine shop RFQ summary
- Next step after the machine shop RFQ summary
What you need before you start the machine shop RFQ summary
- Quote-request intake note
- Received-file register
- Quote-request checking rules
Rules to write down before the machine shop RFQ summary
- Staff revision decisions control which drawing applies.
- Keep supplied quantities and revision labels unchanged.
- Engineering owns technical interpretation.
- Estimating owns the quote.
What to tell the assistant about the machine shop RFQ summary
Read my quote-request intake note, received-file register, and quote-request checking rules.
Use only these current files for this job.
Prepare a quote-request summary.
List stated part number, quantity, material, dates, revision labels, received files, and unanswered questions.
Keep missing facts marked as questions for the named staff reviewer.
Stop when drawings, quantity, readability, or revision labels are missing or conflicting.
Do not choose revisions, judge production feasibility, calculate cycle time, select tooling, or quote.
Do not send anything or change the source files.
Show the draft, the files you used, and the unresolved questions. Then stop.
A staff member approves every message before it goes out.
Check the machine shop RFQ summary before it goes out
- Are quantity and material copied as supplied?
- Are missing drawings flagged?
- Do conflicting revisions stop the summary?
- Are prices and technical decisions excluded?
What the assistant never does in the machine shop RFQ summary
Write these limits into this job's instructions. Do not send, release work, change revisions, substitute materials, or approve deviations. Have staff check the exact part, revision, quantity, price, attachments, recipient, and final text. Require staff approval before each message goes out.
Next step after the machine shop RFQ summary
Read the industry page for machine shops and precision manufacturing. Check your own site: AI visibility check.
