How to Draft a Project Update From Approved Site Notes: General Contractors.

The customer asks what happened on site. Draft the update from approved notes and the current schedule.

On this page (6)
  1. What you need before you start the general contractor project update
  2. Rules to write down before the general contractor project update
  3. What to tell the assistant about the general contractor project update
  4. Check the general contractor project update before it goes out
  5. What the assistant never does in the general contractor project update
  6. Next step after the general contractor project update

What you need before you start the general contractor project update

Rules to write down before the general contractor project update

What to tell the assistant about the general contractor project update

Read our current job file, approved site notes, update format, and confirmed schedule. Draft a project update in our approved format. Describe only progress documented in the site notes. List open questions and the next confirmed office step. Use dates only from the current schedule. Do not claim an inspection passed. Do not describe unfinished work as complete. Do not assign a crew or change the schedule. Leave the final facts and message with the project owner for review.

Check the general contractor project update before it goes out

What the assistant never does in the general contractor project update

Write these limits into this job's instructions. Do not accept a change or direct building work. Do not schedule work or send the update. Require staff approval before each message goes out.

Next step after the general contractor project update

Read the industry page for general contractors and construction. Check your own site: AI visibility check for trades.