A customer asks when the crew will finish the job. Report documented work and material status, and let the job owner resolve conflicts.
What you need before you start
- Current work order
- Current material-status file
- Crew log
Write these rules down first
- The current work order controls production instructions.
- The crew log controls work documented as completed.
- Production staff control crews and schedules.
- Conflicting material selections stop the draft for the job owner.
What to tell the assistant
Read my current work order, current material-status file, and crew log.
Use only these current files for this job.
Prepare a job-status update draft.
List approved scope, received or pending materials, completed steps, and next confirmed office action.
Keep missing facts marked as questions for the named staff reviewer.
Stop when the work order and material file show different items.
Do not promise arrivals, installation dates, inspection results, or safe operation.
Do not send anything or change the source files.
Show the draft, the files you used, and the unresolved questions. Then stop.
A staff member approves every message before it goes out.
Check before it goes out
- Does scope match the current work order?
- Do materials match the specified selection?
- Are completed steps supported by the crew log?
- Are arrival and safety promises absent?
What it never does
Write these limits into this job's instructions. Do not send, dispatch, order, charge, or change scope or materials. Have staff check the exact customer, work version, selections, attachments, recipient, and final text. Require staff approval before each message goes out.
Next step for garage door and fencing contractors
Next step: read the industry page for garage door and fencing contractors. Check your own site: Is my trade business ready for AI? Free check. Get a written scope: Your written scope.