An inspector returns from a site with a field report and photos. Give the estimator the documented observations, and leave scope and price with the estimator.
What you need before you start
- Current inspection field report
- Inspection photo register
- Estimate-handoff rules
Write these rules down first
- The field report controls supplied observations.
- Qualified technical staff own interpretations of engineering files.
- The estimator checks quantities, scope, price, and exclusions.
- Missing measurements or conflicting location labels stop the handoff.
What to tell the assistant
Read my current inspection field report, inspection photo register, and estimate-handoff rules.
Use only these current files for this job.
Prepare an inspection-to-estimate handoff.
List supplied observations, measurements, files received, customer concerns, and estimator questions.
Keep missing facts marked as questions for the named staff reviewer.
Stop when measurements, location labels, or a referenced engineering file are missing.
Do not decide causes, choose a repair method, calculate missing quantities, or interpret photos.
Do not send anything or change the source files.
Show the draft, the files you used, and the unresolved questions. Then stop.
A staff member approves every message before it goes out.
Check before it goes out
- Are observations copied from the field report?
- Are missing measurements flagged?
- Are location conflicts listed?
- Are repair choices and photo interpretations absent?
What it never does
Write these limits into this job's instructions. Do not send, schedule, change scope, or make technical decisions. Have the account owner check the exact project, sources, recipient, and final customer message. Require staff approval before each message goes out.