How to Draft a Project Update From the Approved Job Record: Foundation and Home Repair Contractors.
A homeowner asks for the status of the repair. Report documented progress and confirmed dates, and let the account owner approve the message.
On this page (6)
- What you need before you start the foundation repair project update
- Rules to write down before the foundation repair project update
- What to tell the assistant about the foundation repair project update
- Check the foundation repair project update before it goes out
- What the assistant never does in the foundation repair project update
- Next step after the foundation repair project update
What you need before you start the foundation repair project update
- Current job file
- Current production-status file
- Approved change list
Rules to write down before the foundation repair project update
- Accepted scope and approved changes control offered work.
- Production staff control documented status and confirmed schedule statements.
- Conflicting production status and approved changes stop the draft.
- The account owner approves the final customer message.
What to tell the assistant about the foundation repair project update
Read my current job file, current production-status file, and approved change list.
Use only these current files for this job.
Prepare a project update draft.
List the last documented milestone, approved scope, access issues, and confirmed schedule statement.
Keep missing facts marked as questions for the named staff reviewer.
Stop when production status conflicts with an approved change.
Do not announce completion, promise stabilization, claim an inspection passed, or confirm requested dates.
Do not send anything or change the source files.
Show the draft, the files you used, and the unresolved questions. Then stop.
A staff member approves every message before it goes out.
Check the foundation repair project update before it goes out
- Does scope match the approved version?
- Are schedule statements already confirmed?
- Do conflicting changes stop the draft?
- Are completion and inspection claims excluded?
What the assistant never does in the foundation repair project update
Write these limits into this job's instructions. Do not send, schedule, change scope, or make technical decisions. Have the account owner check the exact project, sources, recipient, and final customer message. Require staff approval before each message goes out.
Next step after the foundation repair project update